Burke River Bridge Safety Upgrades
This project entailed widening of the bridge entries. The first bitumen seal coat has been applied as a part of the safety works done and the second coat shall be applied in conjunction with the Waverley Creek overtaking opportunity in March 2025. Funding for this project has come from the Transport and Main Roads safety allocation.